From Mark Pauline: Figuring out the lengths for the fuel lines etc on the motoman flamethrower cable bundle. All the parts are made now, a few days of adjustments then time to turn it all on and make some tests!
Next post: New Screw Machine Radio Control
Previous post: Magnet for a heavy-lift Drone
You must log in to post a comment. Log in now.