Below are some pics of work finished on the Pitching Machine and the Spine Robot:
And here Mark and crew finished the new valve banks for the Pitching Machine:
Added on hydraulic hose guides to the Spine Robot. Pics show them at the Spine’s highest and lowest positions:
Click on the image for more